Live AquaMatrix System
Explore a simulated AquaMatrix operational environment. No login required.
Fleet Command Center
Active Plants
7
Fleet Production
159,000 m³/day
Active Alerts
4
AI Optimization Opportunities
3
Plant Monitoring
| Plant | Region | Status | Production | SEC | Recovery | Active alerts |
|---|---|---|---|---|---|---|
| Desert Water Site Alpha | Saudi Arabia | Stable | 24,500 | 3.65 | 42% | 0 |
| Desert Water Site Bravo | Saudi Arabia | Warning | 23,800 | 3.92 | 40% | 1 |
| Desert Water Site Charlie | UAE | Risk | 24,100 | 4.2 | 38% | 2 |
| Coastal Desalination Plant 1 | Spain | Stable | 26,200 | 3.45 | 44% | 0 |
| Gulf RO Plant North | Qatar | Warning | 22,100 | 3.88 | 41% | 1 |
| Gulf RO Plant South | Oman | Stable | 19,800 | 3.72 | 43% | 0 |
| Mediterranean RO | Spain | Stable | 18,500 | 3.68 | 41% | 0 |
AI Insights
Recovery rate deviation detected at Desert Water Bravo.
Recommended action: Stabilize recovery setpoints within 24 hours.
Confidence: 87%
Active Alerts
- 09:41Pressure fluctuation detected — Medium
- 09:38Sensor calibration required — Low
- 09:35Fouling early signal — High
- 09:28Recovery drift — Medium
- 09:12Pressure fluctuation detected — Low
Plant Map
Loading map…
Operations Timeline
- 09:27— Recovery stabilized
- 09:20— Adjustment recommended
- 09:15— Operator acknowledged
- 09:12— AI detected recovery drift